Wuding River direct push pipe laying project is the key control project of Shaanxi Beijing four-city line, its crossing length is 423m, and the diameter of the pipeline is 1219mm.The main structure of the crossing geologies are fine sand layers, and the radius of curvature is 1500m.
Iraq Natural Gas Processing Plant Project
Iraq Graf Project
Iraq Halfaya Oilfield Well Site Power Supply Project
Oil depot project in Nasiriyah, Iraq
Steelmaking and Continuous Casting Project In Iran
Iraq Early Power Station Trial Operation and Operation Support Project
Commissioning and Operation Support of Iran’s North Azadegan
東非原油管道項目
Beijing Gas Tianjin Nangang LNG Emergency Reserve Project Export Pipeline Project
Hebei Xintian Tangshan LNG Receiving Station Export Pipeline Project