該項(xiàng)目水源地為“500”水庫(kù)北壩的放水涵洞,管線末端為烏魯木齊石化公司供排水廠供水車間,輸水管線全長(zhǎng)36.4公里,由兩條管徑為DN800的管線組成,年取水量可達(dá)3000萬(wàn)立方米。該項(xiàng)目成功投產(chǎn)后,可實(shí)現(xiàn)地表水替代米東區(qū)、高新區(qū)的地下水源。屆時(shí),將有效降低米東區(qū)地下水采水量,大幅提升市政、工業(yè)供水的保障能力,對(duì)促進(jìn)米東區(qū)生態(tài)環(huán)境建設(shè)具有重要意義。
Iraq Natural Gas Processing Plant Project
Iraq Graf Project
Iraq Halfaya Oilfield Well Site Power Supply Project
Oil depot project in Nasiriyah, Iraq
Steelmaking and Continuous Casting Project In Iran
Iraq Early Power Station Trial Operation and Operation Support Project
Commissioning and Operation Support of Iran’s North Azadegan
東非原油管道項(xiàng)目
Beijing Gas Tianjin Nangang LNG Emergency Reserve Project Export Pipeline Project
Hebei Xintian Tangshan LNG Receiving Station Export Pipeline Project